Паровой котел серии LSS на дизельном топливе 200


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


-162


 _20181008141253


































Product Name


Vertical Steam Boiler


Model


LHS


Steam Capacity


50-1000KG


Working Pressure


0.4-1.25Mpa


Steam Temperature


152-184℃


Operation Type


ON-OFF Control


Thermal Efficiency


92%       


 












































Excellent Structure




Two Fire-Passes



Automatic Control



Automatic Water Feeding


New Wet-Back Design


Automatic Water-Level Control


Corrugated Furnace


Automatic Pressure Regulation


Corrugated Fire-tube


Automatic Over-Pressure Relief




Quality Burner




European Brand (BALTUR)



Visible Operation



Visible Working Pressure


Complete Combustion System


Visible Fuel Consumption


Automatic Ignition


Visible Working Pressure


Two-Stages Fire


Visible Steam Temperature


 


 



Products Paremeter

steam generator

6ton gas fired steam boiler price (17)Factory Direct Price!! Aotumatic 0.5Ton 1Ton 1.5Ton 2Ton 3Ton 4Ton 6Ton 8Ton 10Ton 15Ton 20Ton Industrial Steam GeneratorFactory Direct Price!! Automatic 0.5Ton 1Ton 1.5Ton 2Ton 3Ton 4Ton 6Ton 8Ton 10Ton 15Ton 20Ton Industrial Steam Generator 1Factory Direct Price!! Automatic 0.5Ton 1Ton 1.5Ton 2Ton 3Ton 4Ton 6Ton 8Ton 10Ton 15Ton 20Ton Industrial Steam Generator 2-1_05.jpg78


 


FAQ:
1. What are the available fuel for the oil gas fired boiler?


 


Oil gas fired boiler could burn both liquid fuel and gaseous fuel. The liquid fuel could be heavy oil, light oil, diesel, furnace oil, bunker oil, LPG (liquefied petroleum gas), etc. The gaseous fuel could be natural gas, city gas, bio-gas, etc.


 


 


Q2: Why should you believe our boiler quality?


 


(1).Strength calculation report with applied materials information;


(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;


(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;


(4).Hydrostatic test: ensure the standard working pressure and safety;


(5).Third-party inspection report:By Henan Boiler Inspection Institute;


(6).Passed ISO:9001 and SGS certificate.


 


 


Q3: What about the installation and Commissioning?


 


After you receive the boiler, we will guide you to make some preparation for installation;If necessary, our expert will fly to your local place in 72 hours. The experts will responsible for guiding installation and commissioning.





Новинки - Розница

0.0203 s.