Поделиться:
Multi-layer Mesh-belt Dryer is a kind of batch, continuous production.The main heating mode are electric heating and steam heating.Its main principle is to put the material evenly spread in net, net belt with 12-60 steel mesh belt, reciprocate by dragging gear in dryer, hot air between the material flows and water vapor from moisture discharge hole, so as to achieve the purpose of drying.
Temperature (oC) | 50-140 | |||||
Steam pressure (MPa)) | 0.2-0.8 | |||||
Steam consumption (kg / h) | 360-600 | 420-720 | 450-840 | 480-960 | 480-960 | 630-1350 |
Heat transfer area (m2) | 816 | 1020 | 1056 | 1320 | 1344 | 1680 |
Dry strength kg water | 150-450 | 220-550 | 240-600 | 280-750 | 280-750 | 350-900 |
Number of fans | 14 | 17 | 14 | 17 | 14 | 17 |
Total machine power (kw) | 30.8 | 37.4 | 42 | 51 | 56 | 68 |
Total power (kw) | 35.3 | 41.9 | 46.5 | 55.5 | 60.5 | 72.5 |
Dimensions(L×W×H) | 9.77×2.2×4.5 | 11.77×2.2×4.5 | 9.77×2.6×4.7 | 11.77×2.6×4.7 | 9.77×3.06×4.9 | 11.77×3.06×4.9 |
Total weight kg | 4800×3 | 5780×3 | 5400×3 | 6550×3 | 6350×3 | 7800×3 |
Q: Are you trading company or manufacturer ?Wbat about your after-sale service?
A: We are factory.And we offer the before and after service.First,we can offer the lab or sample for you.Then inspection in my company,empty operation then do export.And our engineer will stay on site to do installation.Once broken,our person will arrive in 48 hours.Any spare parts broken,we will express in 12 hours.
Q: How long is your delivery time?
A: Generally speaking it is 10-20 days if the goods are in stock. or it is 30-45 days to make the machines based on your request.
Q: What is the minimum order quantity?
A: For our machines,you can make order based on your purchase schedule.Just only one set is welcome.
Q: What is your terms of payment ?
A: Payment<10000USD, 100% in advance. Payment>10000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: