-The 10th day , Main frame, sus304 roller
-The 20th day , Tanks, Insulation material , Component for the main frame construction
-The 30th day, mold washing tank, chain, wheels, bearing, motors,packing machine, Gas boiler , purify machine
-The 45 days, fan pipe, heater pipe, molds,Air heating system , Waste water system ,
-The 55 days , Auto stripper, auto counter. All mateors , Power Cabinets
-The 70 days , Hand molds,finish all shipping.