1. Switch on the power, start the switch, Connect the water intake with the tap water opening through the hose. The sewage discharge can be connected to the hose, the discharge container or the sewer directly.2. Before starting the machine, put the potatoes through the mouth of the cover. Type 350/10-15 kg each time is advisable, type 450/20-25 kg each time is advisable.
3. Turn on the water inlet switch, flush the water into the rotary cylinder, properly adjust the water discharge of the metal
inlet pipe, and start the machine switch.
4. The machine will work for about 2 minutes, turn off the power switch and water switch, depending on the peeling condition of potatoes, if the skin of potatoes has been removed, you can open the barrel door, start the power switch, potatoes in the material rotating push, from the barrel door automatically discharged.