Промышленный газовый котел YS газовая горелка для


Поделиться:

Цена:732,00 $ - 745,00 $*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики



Contact Us


-(750).jpg





Recommend Product

IMG_20190513_11110 .jpgIMG_20190328_114619 .jpg- .jpg




Product Description


Industrial Natural/Liquefied Gas Boilers Burner




















































Natural Gas

Natural Gas Consumption


2.3-11 (cubic/hour Nm3/h)
Output Power23.2-116 (dry watt kW)
Output Heat20000-100000 (kcal/h kcal/h)
Power Supply220/50 (V/Hz)
Adjustment MethodSingle-stage 
Motor Power180 (W)
ControllerSiemens
Air valveDongsi/Honeywell (optional)
Intake Port Size1/2"
Packing Size630X440×380 (mm)
Gross Weight25kg

 




















































Liquefied Gas
Liquefied Gas Consumption1.8-9 (kg/h Nm3/h)
Output Power23.2-174 (dry watt kW)
Output Heat20000-150000 (dry calorie/hour kcal/h)
Power Supply220/50 (V/Hz)
Adjustment MethodSingle-stage 
Motor Power180 (W)
ControllerSiemens
Air ValveDongsi/Honeywell (optional)
Intake Port Size1/2"
Packing Size630X440×380 (mm)
Gross Weight25kg

 


Application:


Steam, hot water, boiler, cooking stove, spray coating, hot air generator, baking equipment, melting furnace,


heating furnace, incinerator, and other industrial furnaces 


 


Installation Process:
(1). Install the mounting flange asbestos gasket on the combustion tube, extend the combustion tube into


the furnace, and align the screw holes to fix the mounting flange on the furnace body. After confirming the


position of the extension into the furnace, lock the screws everywhere. Make sure that the burner is installed firmly.


Note that the burner should be installed horizontally or vertically, not inclined.
(2). After the burner body is installed, connect the fuel oil inlet and return pipes to the oil inlet and return ports of the oil pump according to the design. It should be noted that a filter should be installed on the oil inlet pipe and the filter should be cleaned regularly. After the connection is completed, check the tightness of the pipeline.


 





Product Pictures

1 .jpg2 .jpg3 .jpg4 .jpg5 .jpg6 .jpg7 .jpg8 .jpg10 .jpg11 .jpg9 .jpg8.jpg9.jpg .png

 





FAQ


1. How fast can I get the quotation?


We usually quote immediately (whthin 30 minutes) after we get your inquiry.If you are very urgent to get the price, please call us on Alibaba / WhatsApp / Skype / Gmail


 


2. How can I get a sample to check your quality?


(1). Contact us, and we will negotiate the best price possible for you.


(2). Free Sample: Sample cost can be refundable if your following order quantity is large enough.


 


3. How to pay?


1). To pay by Alibaba Trade Assurance Order, which can be drafted by us. All order details and payment methods are included. Please send us your consignee information including name, detailed address, cell phone number and zip code after confirmation of product specification, order quantity and price with us. You will receive Trade Assurance Order by mail when it's drafted. Please check all the order details and make the payment.


Secure online payment options include e-Checking, credit card and T/T.


2). To pay offline, you can pay by T/TWestern Union, PayPalAlipay and WeChat PayWe will send you our account information.


3). We will handled your order within 24 hours upon receiving cleared payment.


 


4. How fast can I get my package?


(1). DHL: Southeast Asia 3-4 days / others 3-5 days.


(2). FedEx: Southeast Asia 3 days / others 4-6 days.


(3). UPS: Southeast Asia 3-4 days / others 4-6 days.


(4). TNT: Southeast Asia 3-4 days / others 4-6 days.








-750

-(750).jpg





Новинки - Розница

0.0168 s.