No. | Product Name | Supplier | Buyer |
1 | Fundamental Works in Manufacturer's Supply Area (Layout Plan) | √ | |
2 | Basic civil design | √ | |
3 | Provide the layout of slurry pond and plant layout | √ | |
4 | Plant design and Project | √ | |
5 | Energy consumption per machine (vacuum, water, electricity, air pressure and heat) | √ | |
6 | Manufacturer's guidance on installation, testing and commissioning of supply equipment | √ | |
7 | Installation, testing and commissioning of equipment supplied by the manufacturer | √ | |
8 | Manufacturer provides solutions for auxiliary equipment such as beating system, raw material handling, inspection, packaging, etc | √ | |
9 | Electrical grounding requirements | √ | |
10 | Provide a detailed list of purchased auxiliary equipment | √ |
Project Equipment Installation | ||||||||||
NO. | Product Name | Supplier | Buyer | Supervise | ||||||
Supplier | Buyer | |||||||||
1 | Installation of equipment supplied by the manufacturer | √ | √ | |||||||
2 | Other supporting items provided by the manufacturer (including the slurry supply system) | √ | √ | |||||||
3 | Skilled technical and non-technical personnel | √ | ||||||||
4 | The training of operators | √ | ||||||||
5 | Plant construction, foundation and main structure construction | √ | ||||||||
6 | Installation of all field piping (air, water, steam and drainage) outside the equipment supplied by the manufacturer | √ | √ | |||||||
7 | Pipe, ground wire embedded drawings | √ | ||||||||
8 | Site wiring | √ | √ | |||||||
9 | All lighting accessories | √ | √ |