Tigerrig длинная Производственная история S88.9 цепь поезда для буровой


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


Tigerrig long manufacture history S88.9 trains chain


for drilling rig


 



Product Description


 


Products are made of high quality alloy steel production.  The plates are punched and squeezed bores by precision technology.  The pin, bush, roller are machined by high-efficiency automatic equipment and automatic grinding equipment, then through heat treatment of carburization, carbon and nitrogen protection mesh belt furnace, surface blasting process etc.  Assembled precision by Internal hole position, spin riveted by pressure to ensure the performance of the entire chain.


 





Specification


 1.PNG2.PNG





Product Pictures


 -2-4-3-5-1-6





Particulars


 Trans Chain_01 (1)Trans Chain_01 (2)Trans Chain_01 (3)Trans Chain_01 (4)Trans Chain_01 (5)





Packaging & Shipping


 


Payment term


Trade term: EXW or FOB shanghai, CIF, DDU, CFR


 


Packing detail


Waterproof cover the bare machine according to API standard


All of the productions are inspected carefully by QC before delivery.


 


Delivery time


1.    Warehouse machine: 1 days after 100% payment.


2.    booked machine: 30-45days after 30% payment.


 


Welcome oversea rig manufacturer to cooperate with us.


 


Tigerrig-Drive--Chain-(12)Tigerrig-Drive--Chain-(11)Tigerrig-Drive--Chain-(9)Tigerrig-Drive--Chain-(14)Tigerrig-Drive--Chain-(8)


 





Certificate


5 





Cost-Effective


 


As the price compete, many company would use poor materials, such as poor seals, low quality square parts, use Casting instead of forging to drop the cost. So please never compare the price only. for us, we always insist high quality first, we hope can do long-term business with you, So we always use better materials to ensure the high quality, be honest and Fine workmanship always to customers and do long term business.


 


Warranty


 


1.    All of our machines give 1-year warranty.


2.    The cost of engineer installation is 400 USD/day; we are responsible for the cost of engineer’s transportation to your country.


3.    Customer is responsible for the cost of engineer’s meals, accommodation, and security. If you don’t need this, we cut this cost from offer list, please tell us in advance.


4.    Within guarantee period, we supply free after service. After guarantee period, we supply square parts in 20% discount.





FAQ


 


 


1.How is your workflow?


We can confirm the specification and specification first, and then sign the sales contract and the drawings. Once the drawings are confirmed, we will take photos for you to confirm that the goods are new and in shipment before shipment. Please pay the balance before the machine leaves the factory, and then we will ship the machine to Shanghai.


 


2.How to deal with product quality problems?


We provide 24-hour online service, we give 24 hours online, skype: tiger-rig, urgent WeChat: drillingrig,if there is an agent or branch, please ask our branch for help, such as in Russia, the United States, Dubai, the manager will come to your company or serve you by mobile, if there are technical questions, we will provide 12 hours online answers at 8:30-12:00, 14:00-18:00.


  


3.Are you plant or trade company?


We are plant, our address is: No.726, xingcheng road, Xindu Town, Sichuan Province, China,610500.


 


4.How can I get the quotation?


Please send your machine old brand, model, specification (such as power, rope size), nameplate photo to us, if u have tender document, ples also send to us, usually, we need to work on it for 1-2 days.


 


5.What is our delivery time?


Some of shale shaker, drilling fluid centrifuge, mud cleaner, sand pump, mud agitator is in stock supply, delivery time is 1 days after you make online payment in Alibaba. Book solid control machine delivery time is :7-35 days.


 


6.What about your work process?


We can confirm the manual and specification first, and then sign sales contract sign the drawing, once confirm the drawing, the before delivery, we will take photo for you to confirm the goods are new and shipping station, before machine leave factory, please pay remain payment, then we truck machine to shanghai.


 





Новинки - Розница

0.0177 s.