Охлаждающая башня


Поделиться:

Цена:2 400,00 $ - 2 450,00 $*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики



Product Description


 


      Anyda, as industrial water chiller plant, have gradually produced Industrial Chiller, 100 Tons Cooling Tower, Water Chiller, Air Cooler, Oil Chiller, Low Temperature Chillers, Hot Water Chiller, Heat Pumps and Central Air Conditioner which are widely applied to plastic & rubber machinery, daily-use chemical, textile, general machinery, laser machinery, LCD and PCB industry, electroplating, equipments of laboratory, food, pharmacy, etc.


cooling tower manufacturer.jpg


Description:


1.AYD-series cooling tower adopts high-quality PVC film and its honeycombed fan- pattern quietly increases the cold-and-hot alternative capability, stands the high temperature to 56℃, guarantee that the water tower can reach the best standard. Besides, the tower have in store green film and heat-resisting film(100 centigrade) to be chosen from.


2.The fan is axial-flow one and it’s made of high-quality plastic or aluminum alloy. Each fan had been positioned and balance-tested strictly by professional before it came out of the factory.


3.All the metal main accessories are made of thickened steel by the original factory, have been handled hot-dip galvanizing by ISO and provide with stainless-steel accessories.


4.The casing of the water towers is wholly acid-proof and alkali-resistant advanced glass fiber. All the carrying pipes and sprinklers are made of advanced plastic, need not lubricant and durable


 


Design Parameter


 


1.Standard Working Condition: atmospheric pressure P=99400Pa, water inlet temperature t1=37°C, water outlet temperature t2=32℃ design wet-bulb temperature t=28°C.and the real-time temperature difference Δt=5°C.


2.Medium temperature Working Condition: water inlet temperature t1=43C, water outlet temperature t2=33℃design wet-bulb temperature t=28C. the real-time temperature difference Δt= 10°C.


3.Hiah temperature Working Condition: water inlet temperaturet1=60°Cwater outlet temperature t2=35°C, design wet-bulb temperature t=28C the real time temperature difference Δt= 25C.


 


Instruction


A. environment choosing


1. To avoid being installed in water-proof gallery or high wall easy to reflect sound and to install it on the roof or open-to-air place.


2.When two or more cooling towers are put to use, pay attention to the interval of the tower bodies.


3. To avoid being installed in place surrounded by walls on all sides or airtight and pay attention to the interval of the tower bodies and the external walls.


4. To avoid being installed where there is soot or much dust so as to prevent the blocking of the film.


5.Keep it away from the warmer places such as the kitchens and boiler rooms.


B. Installment Key Point


1.The foundation should be placed level and the centre line of the cooling tower should be vertical. Otherwise, it will influence the water distribution and the working of the dynamos.


2.For the towers heavier than 175 tons, of which the in-and-out water pipes should be set with supports.


3. When two or more towers share the water pump, a balance water pipe should be added between the basins.


4.The connection of cycling out-and-in water ought to be suspension one.


5.The fan wings of the cooling water should accord with tower wall gaps. In no case will it be allowed that the interval is big. When noticing the condition, people should solve it in time.


6.Motors and reducers need checking at regular intervals. The oil level of reducers should be checked often.


C. Starting Check-up


1.Whether all the screws are frapped and there is sundries inside the tower.


2.Whether the turning of fans and dripping system is smooth.


3.Whether the power voltage is consistent with the motor voltage.


4. Whether the installment of belt combination is right.


5. Open the water inlet valve and fill the basins and water pipes. The water level should be 25mm below the full water.


6.When starting up, open the pump first and then the fan, check the wind direction and air quantity, adjust it immediately until the command is met.


7. When ceasing, cease the fan and then the pump.


D. Running Check-up


1. Keep it clean inside the water tower and conduct the water-conditioning regularly.


2.After running for about 60 hours, it needs checking belt tension to ensure the normal condition.


3.The oil level of the gear reducer should be checked and the lubricant oil needs changing after 150 hours.


4.When the cooling tower is running, people should be in charge of it. Pay constant attention to the change of the electricity and water temperature and conduct regular check-ups for the dynamos, reducers, water distributors and the like.


p.pngpp.png


 





Detailed Images


DD.png 





Certifications


Certifications.png


 





Packaging & Shipping





















pppp.pngPackaging
Sizexxxx (L) *xxxx (W) * xxxx (H)  (According to container size)
Weight550kg
Packaging DetailsThe normal package is wooden box(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.

 





Why Choose Us


 


AYD.png


 


1.Reply your inquiry within 12 working hrs.


2.Strong R&D team,more than 15 years of manufacturing chiller experience. OEM&ODM is welcomed.


3.Direct factory,offer customer competitive price with high quality chiller.


4.Strict quality control system,professional QC team.


 


 


Some Customers Mentioned


1. Export to : Outer Mongolia


Description: 5units of 36HP air cooled chiller,3units of 50HP air cooled chiller,0-2C glycol outlet temp required, for milk cooling.


2. Export to : Palestine


Description: 2sets of water cooled glycol chiller,with circulating pump and cooling tower. For sprite cooling, from 25C to 2C.


3. Export to: Uzbekistan


Description: Air cooled glycol chiller,-20C outlet,24hrs running.


4. Export to: Thailand


Description: Air Cooled Brine Chiller,-34C brine outlet,for ice cream.


5. Export to: Saudi Arabia


Description: 4nits of air cooled glycol chiller,2-4C outlet,for a sweet manufactures.





Some Customer List


SL.png 





Contact Us


 


CC.png


 





FAQ


1.How does a chiller system work?



 
  Chiller has two circulation,one is process water circulation,the other is refrigerant gas circulation.Heat picked up from the process.Heat transfers to refrigerant circulation.Heat is remove to air or water.

2.How to calculate cooling capacity for chillers


   Cooling Capacity(kw)= Flow Rate(m3/h)*Temp Change(T1-t2)/0.86

   Heat Load= C(specific heat)* M(quality output per hour )*Temp Change(T1-T2)

3.Types of chiller system?

   Air Cooled Chiller and Water Cooled Chiller.Water cooled chiller needs a separated cooling tower and has a higher efficiency,but less easier than air cooled.


 


4. What type of the chiller should I use ?

   It depend on the local environment temperature and water source. If lack of water and low ambient temp , we advise you use the air cooled chiller, if not , air cooled chiller is ok. But for installation,air cooled is more convenient than water cooled.

5. How to select the model of the chiller ?

   It is better to tell us some parameter, such as : Cooling Capacity, Outlet Temperature, Power Supply,Environment Temperature, Application Field, Anti-rust Or Anti-corrosion, and so on.Meanwhile,we could do customized chiller according to your end user consumption.


 


6.Cooling capacity unit conversion?

1 kcal/h = 1.163W,1 W = 0.8598 kcal/h;

1 Btu/h = 0.2931W,1 W = 3.412 Btu/h;

1 USRT = 3.517 kW,1 kW = 0.28434 USRT;

1 kcal/h = 3.968 Btu/h,1 Btu/h = 0.252 kcal/h;

1 USRT = 3024 kcal/h,10000 kcal/h = 3.3069 USRT;

7.The chiller can heat?

Yes,by the electrical heating wire.Please kindly inform us the hot water temp or heating capacity.

8. What is production period ?

   Generally speaking, it is 15-30 days,some standard model there are some stocks, but it all depend on the model ,quantity.

9.What is your company after-sales service ?

   Our warranty period is one year. If there is any problem in this year, we will send you the new parts (not including freight )for replacement. Meanwhile, welcome to consulting the technical knowledge.


10.Chiller maintenance?

Step 1: Keep Tubes Clean

Step 2: Ensure a Leak-free Unit

Step 3: Sustain Proper Water Treatment(prevent scale, corrosion)

Step 4: Analyze Oil and Refrigerant





Похожие товары

Новинки - Розница

0.0283 s.