Центробежный концентратор для оборудования добычи золота


Поделиться:

Цена:3 999,00 $ - 4 999,00 $*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


Gravity Placer Alluvial Laboratory Mini Nelson Knelson Gold Recovery Centrifugal Gold Concentrator


Knelson gold centrifugal concentrator can be used not only for placer gold mining, but also for hard rock mining to recover the natural gold, replacing amalgamation. It is also used to recover gold from the old tailings.


A).Hard Rock Mining: (No Chemicals Required) - NO Mercury, NO Cyanide
B).Alluvial / Placer Deposit Mining & Dredging


Primary gold processing when you know your gold is too fine for a sluice
Reprocessing years of old fine mineral concentrates


Processing daily sluice box fine mineral concentrates
C).Enriching/Upgrading Fine Mineral Concentrates
Classifying and upgrading sluice concentrates
Upgrading concentrates for regional processing
D). Prospecting / Drilling / Bulk Sampling


2)EEM(DX3]%41L2(])3UN87.png



Working principle


In operation, material is fed as a slurry of minerals and water into a rotating bowl that includes special fluidized grooves or riffles to capture the heavies.


Fluidized water/back wash water/recoil water is introduced through the multiple fluidization holes in the inner cone to keep the bed with heavy minerals. Fluidized water/back wash water/recoil water plays an important role during the separation.


--zw.png




 



Product pictures


Capacities range from laboratory scale to 150 tons of solids per hour.Beneficiation test shows that the recovery can be 99%,especially for recovering the natural lode ore gold,when 65% Grind size are smaller than 0.074mm,the recovery is expected up to 98%.For 0.004mm size natural gold, the recovery is 97%.


1.jpg2.jpg3.jpg5.jpgmmexport1553497470440.jpg


 





Specifications

RE27D)LXJQ7$K{%IIVY)}D2.png

 



Working site


Our gold centrifugal concentrator is not only popular in China, but also exported to more than 20 countries in the world, including Sudan, Peru, Chile, Luwanda, Tanzania, Indonisia, India, etc.


7.jpg8.jpg9 (2).jpg9.jpg


 





Our Services


.jpg 





FAQ


Q1: Are you trading company or manufacturer?


A: We are factory.


 


Q2: How long is your delivery time?


A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.


 


Q3: What is your payment method?


A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.


 


Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.


      What minerals are you separating?


      What's the maximum size of your raw minerals?
      How much capacity do you need per hour for your project?




Q5: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of crusher equipments is one year. and  we will supply the spare parts for you at lowest cost.


 

Q6: If I need the complete crushing plant can you help us to build it?

A: Yes, we can help you combine a complete crushing line and give you related professional advices as long as you need. We had already build many mining projects in China & Overseas. 

 

Q7:what's your motor brand?what bearing do you use?

For Motor-China top brand, also can use Siemens as per request .

For Bearing China top brand ZWZ, also can use SKF/NSK etc as per request

 





Новинки - Розница

0.0292 s.