Электростанция морской кран Судостроительный плавающая док-станция одиночный и


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


 


Please accept our thanks for your kindly attention for our Power Station Offshore Jib Crane Shipyard Floating Dock Offshore Single and Double Jib Portal Crane Level luffing Crane


Power Station Offshore Jib Crane


Power Station Offshore Jib Crane


 


Power Station Offshore Jib Crane


Cabin with Good Overview Windows 


All in One Control


 


Cabin with Beautiful Design, Wide Vision.Humanization of interior design can reduce operater's tension and fatigue and improve the working efficiency.


Perfect man-machine engineering design, high control precision, more easy and convenient manipulation.


Shock Absorbing Seat


Multi-functional air-conditioning


Configuration of suspension damping suspension system seat retainer operator body perfectly, maximum absorption of vibration of the equipment operation and reduce the labor intensity.Adjustable seat with comfortable, breathable feature, and provide the operator a safe and comfortable working environment, prevention of occupational diseases, protect the health of the operator.


With anti-fog and defrosting and ventilation function, can be all-weather operations.Well adapted to harsh climate port, for the operator to provide comfortable working environment.


Noise reduction


Cabin is sealing good, at the same time, ues the high quality green noise insulation materials, healthy environmental protection, build a comfortable working environment.


 


 




 


 


Santo Crane Care More for


Delicate Details


Power Station Offshore Jib Crane





 


 



  • Optimizated electrical room's decoration, and spacious access channel embodies the designer's pursuit of ergonomics. Engineers can simply conveniently maintenance for motor, reducer, cable drum facilities.

  • Rotating disc with waterproof rope design, has a unique structure of the double disc waterproof rope mechanism, can effectively stop the rain into the machine room, avoid rust on inside the motor, electric cabinet, etc.

  • Slewing mechanism running stable and reliable, with electric interlocking rotation anchor device between rotating parts and door frame. Mast anchor pins installed inside the cylinder of the door frame, anchor detection device can automatically detect berth.

  • Two-wire centralized lubrication system, lubrication points with lubrication tee can be automatic refueling, or manually. At the time of reducing maintenance time, avoids the failure lubrication that failure of lubrication points led to a wide range of lubrication condition.


 




 











Parameters


















































 Four-bar linkage Type
Load Capacity16t25t40t
Working Range30m, 33m, 35m, 37m28m, 30m, 35m, 36m30m, 35m, 39m, 40m, 43m
Wheel Dis.10.5m, 12m, 16m10.5m, 12m, 16m10.5m, 12m, 16m
Lifting Speed60m/min55m/min50m/min
 Luffing speed50m/min50m/min45m/min
Rotating Speed1.0~1.5r/min1.0~1.3r/min1.0~1.2r/min
Traveling Speed26m/min26m/min26m/min

 












































 Single Mast Type
LoadCapacity40t45t
Working Range11~30m, 12~35m12~35m, 13~28m
Wheel Dis.10.5m, 16m10.5m, 16m
Lifting Speed25m/min25m/min
 Luffing speed25m/min25m/min
Rotating Speed0.8~1.0r/min0.8~1.0r/min
Traveling Speed26m/min26m/min

Production-We care more on details



 Power Station Offshore Jib Crane


To help you have a good knowing of the portal crane. We prepare a case for your reference, if you need to know more information, welcome to contact us!




























































1Product namesingle mast port crane 25T
2Fabricate standardEuropean standard
3WeldingAccording to European standard. Welder from Italy & Serbia worked for this order.
4CertificatesCE, ISO
5TestingTUV testing.
6Steel pretreatmentSand blasting and primary painting(Jotun Paints).
7Painting5 times Painting. This order we adapt Jotun Paints.
8ElectricalSIEMENS
9Motor BrakeSEW
10Packing

Triple-wrapped


11Payment terms

Progress payments by TT



Pictures below are for your reference.



Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane
Power Station Offshore Jib Crane


Power Station Offshore Jib Crane


 



Новинки - Розница

0.0118 s.