1. How do I get started?
Simply call one of our sales staffs today. We’ll make your job easier by helping determine the best equipment fit for your business or organization. We’ll provide you with samples, pricing and great advice to help you get going.
2. What is the standard floor height? What is the limit for the height?The standard floor height is 1.4m. We advise 5 floors the maximum and the minimum ceiling height not less than 2.5m.
3. How long does it take to manufacture a playground?Production schedules vary depending on the size and complexity of the equipment. However, a general rule of thumb is approximately 15-25 days from the contract date. We will work with you on a schedule that best meets your business needs and we’ll guarantee the installation date.
4. Do you offer installation service outside China?We will provide detailed and professional instruction manuals for you. And yes, we can send our installation engineer to work with your teams. The cost of installation service includes the daily salary of the engineer ($110 per day), round-trip tickets, accommodation, etc.
5. Is maintenance required?
Under normal use and conditions our playgrounds require only scheduled cleaning and inspections. After your equipment is installed, a maintenance manual that contains cleaning and maintenance instructions and schedules will also be provided.