Поделиться:
M25 waterproof metal cable gland nickel plated brass IP68 applied for New energy vehicles
Speification:
Material | Material:Brass,Nickel plated | |
Material | Silicone | |
Sealing Material | Silica gel,EPDM or NBR | |
IP Grade | Clamping range,O-ring,IP68 | |
Temperature Limited | -50℃to 180℃ I | |
Porducts Feature | Connecting more closer with O-Ring and more secure with entire rubber sleeves |
HUNTEC have our own R&D system.
1. For Talent.
We pays a lot to employ technical experts as our R&D team. For example, our Design Engineer Mr.Liu is graduated from Tsinghua University, which is the topest University of China. And our leaders of R&D department have more than 20 years experience in electrical connection field.
2. For Equipment.
We have punching machine, injection machine, CNC, tapping machine, auto assembly line etc
And we have our own mould center, which can opening moulds for our customer by technical drawings.
It is hard to show all our abilities in short words, welcome to inquiry for details.
HUNTEC have our own lab.
CNAS acceridited laboratory (Covering all test items of connection electrical)
1.Test Items:
Vibration, needle flame, CTI, hot wire, aging resistance,High and low temperature,
Salt spray, color difference analysis;
IP grade, air tightness, permeability, RoHS;
Contact resistance, insulation resistance and voltage test,voltage drop and temperature
rise test,High current overload test;
Torque test, drawing force, fatigue, impact,material hardness, etc
2. Our developing Plan:
We are planing to get the UL accreditation certifiation in 2022.
HUNTEC have many Certification.
1. Quality Certification.
CE, UL, CQC, ROHS etc
2. Factory Certification.
ISO9001, ISO14001, ISO45001, OHSAS18001 etc
3. Patents.
We have more than 120 patents, and still increasing.
Q1.What Certificates Have You Got?
A1:Our company is verified by ISO9001,ISO14001,OHSAS 18001 & products approved by CE,UL, ROSH, CQC,EX etc,
and company have got more than 20 Patents.
Q2. What is your terms of payment?
A: T/T 30% as deposit, 70% before delivery or L/C
Q3. What is your terms of delivery?
A: EXW, FOB,CFR CIF,FCA,CPT,CIP
Q4. How about your delivery time?
A: Generally, it will take 3 to 7 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we could produce by your samples or technical drawings. We are power in R&D.
Q6. What is your sample policy?
A: We could supply the samples if we have ready parts in stock, but the customers need to pay the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We keep growing and provide value for our customers.
Please Feel Free to Contact us.