Оборудование для полной горной добычи


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


Complete Mining Gold Ore Mineral Processing Plant Equipment

Complete Mining Gold Ore Mineral Processing Plant Equipment

Product Description

Overview of Flotation Processing Plant

 Flotation Processing Plant
OverviewCopper Ore beneficiation line is mainly composed of jaw crusher, ball mill, spiral classifier, magnetic separator, flotation machine, ore concentrator and dryer machine combining with ore feeder, bucket elevator and belt conveyor which formed a complete ore beneficiation production line.
Advantage1.Low noise in construction site, high air quality.
2.High crushing efficiency with excellent production performance.
3.Our components are all purchasing from famous brands, with good wear resistance.

 

Brief Introduction of Flotation Processing Plant

Henan Zhengzhou Mining Machinery Co., Ltd. offers turnkey solution for Ore Dressing Plant. We are one of the leading project suppliers for Ore Dressing Plant and we work closely with our customers to fulfill their specific needs for a customized packaged solution. Specialized in the fabrication of these machines for decade and this enables us to be in a leading position in the field of Ore Beneficiation Machinery.

  Complete Mining Gold Ore Mineral Processing Plant Equipment

Process Technology

 
Raw material ores is exploited from mountain are big size,so it is necessary to crush firstly,in this process,the raw materials will be feed into primary crusher by feeder,then come into secondary crusher.The materials will go into screen after first and secondry crusher, the suitable size material (≤25mm) will go to next step. Oversize (>25mm) material will go back to secondary crusher to crush again. This forms a closed crush circuit.
In this process, material will be grinded into suitable sizes (about 200 mesh) for beneficiation. After grinding material will come to classifier. In classifier, suitable size material will go to next step. Coarse material will go back to ball mill for grind again. This process is a closed grind circuit.
In this process, materials will be separated by flotation, magnetic separator or gravity concentrating machine. We will get the materials that we need.
After beneficiation, there are some residual water in ore concentration. So we have to carry on concentrate dehydration to meet the requirements of transportation and smelting.

Complete Mining Gold Ore Mineral Processing Plant Equipment

Complete Mining Gold Ore Mineral Processing Plant Equipment

 

500 TPD Ore Processing Line Equipment List for Your Reference

Equipment

Size

QTY (set)

Power (kW)

Remarks

Chute feeder

980×1240

1

7.5

 

Jaw crusher

PE400×600

1

30

Cast steel rack

Jaw crusher

PEX250×1000

2

37

Cast steel rack

Swaying feeder

600×600

1

2.2

 

Rotary ball mill

GM2.1×4.0

1

245

 

Spiral classifier

FLG-2000

1

18.5

 

Magnetic separator

CTB900×1800

1

4

2500gs

Magnetic separator

CTB750×1800

2

3

1400~180gs

1000 TPD Ore Processing Line Equipment List for Your Reference

Equipment

Size

QTY (set)

Power (kW)

Remarks

Chute feeder

980×1240

1

7.5

 

Jaw crusher

PE600×900

1

75

Cast steel rack

Fine jaw crusher

PEX250×1200

2

37

Cast steel rack

Vibrating feeder

DZ-5

2

0.75×2/set

 

Ball mill

GM2.7×3.6

1

475

 

Spiral classifier

FLG-3000

1

30

 

Magnetic separator

CTB-1024

1

5.5

2500gs

Magnetic separator

CTB-1021

2

4/set

1400~1800gs

Complete Mining Gold Ore Mineral Processing Plant Equipment
Complete Mining Gold Ore Mineral Processing Plant Equipment
Why Choose Us

 Henan Zhengzhou Mining Machinery Co., Ltd (ZK) was found in 1956. After half century development, it becomes a comprehensive modernized enterprise, including the business service such as scientific research, design, develop, manufacture, sales, installation, test and training. 

  

We are China Top 5 Mining Equipment Manufacturer

 

Complete Mining Gold Ore Mineral Processing Plant Equipment

 

Our Customer are From More Than 130 Countries

Complete Mining Gold Ore Mineral Processing Plant Equipment

Our Engineers Provide Technical Support On Customer Site 

Complete Mining Gold Ore Mineral Processing Plant Equipment

Certifications

We have got

ISO9001:2008 Quality Management System Certification

CE Certification (Ball Mill)

ISO14001:2004 Environmental Management System Certification

OHSAS 18001:2007 Occupational Health&safety Management System Certification 

 

Complete Mining Gold Ore Mineral Processing Plant Equipment

 

Get solution design and price list for you project,Send Inquiry now !

 

↓↓↓



Похожие товары

Новинки - Розница

0.0346 s.