Поделиться:
The coating system consists of amine-terminated polyether resin, amine chain extender and MDI prepolymer, functional filler is added, and the product belongs to spraying, self-cured and thick coated polyurea. It is used together with ground coat paint and facing coating to form a firm, tough and decorative ground protection system.
Tennis court, basketball court, natatorium, hospitals, kindergartens, electronic super-clean workshops, gyms, underground parking and construction site ground.
Coating Property | |
Solid Content | 100% |
Viscosity (25℃) | ≤1000mPa.s |
Density (25℃) | A: 1.080-1.160 g/cm3 |
Theoretical Coating Amount (Dry Film: 1mm Thickness) | 1.10kg/m2 |
Volume Mixing Ratio | A:R = 1:1 |
Shelf Life | 1 year |
Curing Characteristics | |
Gelation Time | 30-50 seconds |
Touch Drying Time | 90-120 seconds |
Curing Time | 24 hours |
Maximum Strength | 7 days |
Coating Property* | |
Tensile Strength | ≥14MPa |
Elongation | ≥250% |
Hardness | ≥85A |
Tearing Strength | ≥75KN/m |
Adhesion | ≥8MPa |
Impact Strength | ≥10J |
1.Q: Are you a factory or trading company?
A: We are factory.
2.Q: Where are you located? What’s your shipping port?
A: We are located in Dongying, Shandong Province, East of China, 2 hours high train from Qingdao.
Usually ship from Shanghai or Qingdao, or depends
3.Q: What is the payment terms?
A: T/T,30 % advanced & balanced upon BL copy. Or L/C at sight .
4.Q: How can I get some samples?
A: Sample is available
OUR SERVICE:
1.Free samples: free samples are available for testing.
2.Prompt delivery: Usually within 10 working days after receiving the deposit.
3.Timely update: Loading Photos (on-site loading and finished-loading) and accordingly documents.
4.After sale service: Supply technology support, timely deal with problems after receiving the cargoes.
5.OEM/ODM service