China Factory Direct Sale Good Rubber Machine Calender


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


China Factory Direct Sale Good Rubber Machine Calender Price


 


4_.jpg


 


 XY2-26S.jpg



Product Description


Usage:


Rubberizing and fractioning of textile material, rubberizing of wirecord fabric, sheet, and counter plate(embossed) of rubber material, separation of fabric and film, as well as joint of multi-layer laminate film.

Rubber Calender Machine General design:

It mainly contains roller, rack, backplane, adjustment, device, transmission system, roller temperature control device, security device, lubricating device, etc.

Rubber Calender Machine Features:

1. The roller is made of chilled cast iron alloys, whose work surface has high hardness, wear-resistent and durable life.
Steam, cooling water, and heat-conducting oil can pass into the rollers cavity, so that the working temperature can be adjusted in order to meet the technical requirements.

2. Roll spacing can be adjusted both by manual or electric mode.

3. Roller bearings lubricating can adopt drier oil or dilute oil.

Application:
1. The Roll Rubber Calender - Rubber Machinery is mostly used in oppression of rubber products and textile(like cotton, rayon, nylon etc). The precision calender besides has the ordinary calender main spare part and the equipment, increased the guarantee rolling precision installment.
2. We have three-roll, four-roll and two-roll calender, should any of items be of interest to you, please contact me for further details.
3. Two Roll Rubber Calender - Rubber Machinery is according to certain form arrangement, under certain temperature, extends the rubber or the plastic suppression certain thickness and the superficial shape film.


 


   








































































Model



XY-630



XY-900



XY-1120



XY-1400



XY-1500



XY-1730



XY-2130



XY-2430



Roll DiameterxLength



230x630



360x900



360x1120



400x1400



450x1500



610x1730



710x2130



810x2430



Friction Ratio



1:1:1


1:1.42:1



1:1:1


0.733:1:1


0.733:1:0.733



1:1:1



1:1:1


1:1.383:1.383


1:1.383:1



1:1:1


1:1.5:1



1:1:1


1:1.4:1



1:1:1



1:1:1


1:1.5:1



Middle Roller


Linear Speed(RPM)



0.8-8



3-21.06



1.5-15



3-26.39



2.62-26.2



5.4-54



8-50



2-20



Nip Adjustment


Range(mm)



0-7



0-10



0-10



0-10



0-6



0-20



0-20



0.5-25



Min. Thickness of


Products(mm)



0.2



0.2



0.2



0.2



0.2



0.15



0.15



0.15



                   


 


 


6_.jpg


 





Packaging & Shipping


 


 5_.jpg


 


 


 





Our Services


1,Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2,In the process of production, we will take photos and send to customers for their track the progress.
3,Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4,We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5,We supply overseas engineer service and help to train your workers to operate the machine.


workshop


 


customer


 


 





FAQ


 


1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.


 


                                                                    Welcome to our factory!





Новинки - Розница

0.033 s.