1 2 мм оцинкованная стальная проволока комплекты освещения Подвесные для подвешивания


Поделиться:

Цена:0,85 $ - 0,89 $*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики


1.2mm galvanized steel wire Light kits Suspension Hanging kits for LED panel hanging



Produnct Description























































1.Diameter



1.5mm,2.0mm,3.2mm ,etc 



Custom-made available



2.construction



7*7  etc.



3.Lamp Body Material:



Aluminum Alloy + steel wire rope



4.MOQ



500pcs Light Fixture Hanging Cable kits



5.length



Can be customized



6.surface for the assembly 



nickel plated 



7.Accessory:



End caps & suspension kit & mounting &clips etc.



8.Lead  time



7days if there were enough material in stock



9.sample



Free sample Light Fixture Hanging Cable kits available if existing one



10.specification:



Using wire rope 7x7etc ., easily hang objects, permanently or temporarily, with the Grip lock Grippers. Grippers offer strength, reliability, adjustability, and can be re-used.



11.application



For LED panel lights, LED chandelier, LED downlight, LED billboard etc.



12. Product      highlights 



1. Strong aluminum support with hanging rope, keeping the fixture     firmly placed


2Can be customized as your design.


3Perfect for home living room, bedrooms, office rooms






Display Pictures


Adjustable Ceiling Cable Gripper Light Fixture Hanging Cable kits Adjustable Ceiling Cable Gripper Light Fixture Hanging Cable kits C20 1.jpgC20 7.jpg





About us


Light Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kits


Light Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kitsLight Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kitsLight Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kitsLight Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kits


          





Certifications


Light Fixture Hanging Cable kits.Ceiling light fixture hanging kits.light hanging kits 





FAQ


1. How do you design a wire cable assembly?
Of course, we have to know your application firstly and a number of factors have to be considered, such as workload, safety abrasion, environment, cycle life, flexibility, cost, When we design the steel wire cable assembly.


 2. What’s the safety factor of your product?


General, use a 5 to 1 or 3 to 1 safety factor when we design it, example: breaking load is (1000N) 100kg, the safety factor is 5:1 (200N) Breaking strength should never be considered the rope's working load


 3. What’s the lead time of my order?


It largely depended on the size of your order .normally, 15days. if you are in urgent need of it, we will try my best to meet your requirements.


 4. How to place an order?


We produce according to customers’ specifications, so you’d better give us complete information as specified below:


Material,Diameter,Construction,Coating,Length,Packing,Quantity, Remarks


5. Are there different types of materials and qualities of the product or is it just one type?


Many types of quality are available. We are a factory manufacturer in Dongguang City, China, we offer OEM and ODM service. So you can choose from our design, or we make a new product as you requested.


 





FAQ 2


6. We would like to test our market, in order to see our customer´s reactions. What would be the EXW Price for an initial 100 units orders?


We are not sure your quality requirement, but the order of 100pcs is ok here, is it possible to discuss more details with you first, then we can give you the best offer accordingly?


7. What would be the shipping cost of the 100 units, shipping to El Paso, Texas, USA?


You can ship goods by sea or by air, if we confirm all the details for products, we will give you the best price for shipping cost.


8. Do you accept payments through Paypal?


Yes, and most payment terms are also welcome.
9. What's the lead time for the order?


Normally our lead time is 15-25 days for custom orders, for stock orders is just within 3 days.


10. What is the weight load?


Weight load is based on the material, size, used range,etc., we have different designs, which weight load you prefer, we can recommend a suitable product for you.


11. Do you accept customized order?


Yes, welcome to give us your design for reference, then we can discuss details accordingly.


12. Why are you more trustworthy than the other factories?


Pls see our advantages as below,


 Management


ISO9001 certification, 7S, KPI, NPS, PDCA management deployed, Regular employee training, Stable growth over 15 years comparing to an industry average of 5 years


 R & D capacity


Design(ODM), developing(OEM/ODM), Technique(idea realizing and production support), 15 engineers(HR), Solidworks/UG(software), 3D plastic printer(prototype)


Engineering capacity


Mold design/making/maintenance, Production equipment design/making/maintenance


Production capacity


40% automation, Die-casting, Plastic injection, Braiding, Welding, Punching process in-house


Supplier chain


80% coming from major players, Multiple options, Integrated industrial sources


Quality control system


Material inspection, Production inspection, Warehouse inspection, Preventive actions, Corrective actions, Internal audit(workshop), External audit(supplier), Testing equipment


Sales team


2 units(domestic/international), 20 salesperson, 7x24 service


Competitive price


We didn't become leaders in our field by chance, your solution will be delivered on time, on budget and to the highest quality standards. State-of-the-art production facility means cost-effective and timely production.


 


If you have any questions else, please feel free to contact us. 


 


 





Our Principle


Our Principle 


• 1S-Seiri: Distinguish the purpose of the item and clear out the unused


• 2S-Seiton: Necessities are placed in appointed sections, clearly marked for easy handle 


• 3S-Seiso: Remove garbage and dirt and prevent contamination 


• 4S-Seikeetsu: Maintain the previous 3S, institutionalize and standardize 


• 5S-Security: Ensuring safety, caring for life, and putting people first 


• 6S-Speed/saving: Industry and frugality, care for public property, take the factory as home, common development 


• 7S-Shitsuke: Develop good habits and improve the overall quality





Contact us


              *Tel:++8615322893352


             *Wechat:+8615322893352


email.jpg





Похожие товары

Новинки - Розница

0.0498 s.