Поделиться:
item | value |
Table Travel (X) (mm) | 125 |
Number of Axes | 2 |
Machining Capacity | Heavy Duty |
Table Travel (Y) (mm) | 1900 |
Table Travel (Z) (mm) | None |
Spindle Taper | Other |
Range of Spindle Speed(r.p.m) | |
Condition | New |
Place of Origin | China |
Type | Universal |
Dimension(L*W*H) | 1125*1050*600mm |
Weight (KG) | 186 |
Warranty | 1 Year |
Online support, Video technical support | |
Key Selling Points | Automatic |
After Warranty Service | Video technical support, Online support |
Applicable Industries | Construction works , Food & Beverage Shops, Other, Advertising Company |
Local Service Location | Nigeria |
Showroom Location | Malaysia |
Marketing Type | New Product 2020 |
Machinery Test Report | Provided |
Video outgoing-inspection | Provided |
Warranty of core components | 1 Year |
Core Components | Pressure vessel, Other |
width | 250mm |
depth | 1-5mm |
efficiency | 200/h |
Product name | Milling Machine Repairing |
Function | Milling Drilling Tapping Routing Chamfering |
CNC or Not | Normal |
Usage | Metal Parts Machining |
Color | red |
Use | Hobby Mill Drill |
Key word | Universal Millingmachine |
1. Waterproof treatment and roughening of bridge deck surface, beam surface flatness and waterproof treatment of high-speed railway box girder.
2. Milling and removal of asphalt pavement bumps, ruts, mesh cracks and pits. Remove ice and snow from the bridge deck and pavement.
3. Before the new paving of asphalt concrete, the original old pavement shall be slightly roughened, or the milling and roughening operation in the corner area and the area with dense reinforcement shall be completed with a large milling machine.
4. Remove the ground coating, paint and various traffic markings; When the ground is damaged and dirty and needs to be renovated, the old floor surface shall be removed. 5. Remove airport road markings, runway tire braking marks, etc., and regain the rough surface with high friction coefficient. 6. The over elevation parts of cement asphalt pavement, expressway bridge deck, bridge staggering and epoxy resin wear-resistant ground shall be milled and leveled
7. For the construction of road micro surface, the original old pavement surface shall be milled and removed to prepare for slurry seal.