Поделиться:
Floor standing fan coil unit for water chiller,hot water fan coil
Types | Fan coil unit | ||||||||
model | FP-34LM | FP-51LM | FP-68LM | FP-85LM | FP-102LM | FP-136LM | FP-170LM | FP-204LM | FP-238LM |
Weight KG | 11 | 13.5 | 15 | 16.5 | 17.5 | 23.5 | 28 | 30.5 | 32.5 |
voltage | 220V | ||||||||
Rated air volume m3/h | 340 | 510 | 680 | 850 | 1020 | 1360 | 1700 | 2040 | 2380 |
Noise dB(A) | 37 | 39 | 41 | 43 | 45 | 46 | 48 | 50 | 52 |
Cooling capacity W | 1800 | 2700 | 3600 | 4500 | 5400 | 7200 | 9000 | 10800 | 12600 |
function | Cooling and heating | ||||||||
application | Office block,Hotel,Sports venues and so on | ||||||||
power w | 37 | 52 | 62 | 76 | 96 | 134 | 152 | 189 | 228 |
Max working pressure Mpa | 1.6MPa | ||||||||
Data under cooling conditions | The dry ball temperature is 27 ℃, the wet bulb temperature is 19.5℃, the inlet water temperature is 7℃, and the water temperature difference is 5℃ | ||||||||
Data under heating conditions | The dry ball temperature is 21℃, and the inlet temperature is 60℃ |
Packing: Plastic film packaging .
Delivery: Within 30 days after receiving advanced payment.
Shandong GRAD Group Co.,Ltd. is established in 1993, located in Dezhou Shandong,covering an area of 700 thousand square meters, with more than 2500 employees. The total capital is 925 million RMB, and annual output value exceeds 2.5 billion RMB. During 20 years' development, GRAD Group concentrates on the central air-conditioning and compound material products and show the world a high-technological enterprise combining construction budget, technical consultation, product design, Manufacturing and debugging service. There are 10 series, over 130 Kinds of products covering the whole central air-conditioning series and the compound materials series Products. The high standard workshop covering 350 thousand square meters.
Before-sale services:
(1) Tell customers how to use our products and matters needing attention.
(2) Guide customers to choose the best and economic product, recover the investment within short time.
(3) Site inspection if you need.
In-Sale services:
(1)Quality control must be inspected strictly.
(2)In accordance with the agreements stipulated in the contract.
After-sale services:
(1) If the project needs our installation guidance, we can send our engineer and translator. We can also send customers installation video to teach them how to fix and operate with
our product.
(2) Usually, our product warranty is 18 months after leaving factory or 12 months after installation. within this months, all parts broken will be responsible for our factory.
(3) Regular contact with customer, consult with the customer feedback, come true with
the customer's two-way communication.